A continued focus on mitigating and preventing an adverse impact on the environment
Is an integral part of our long-term sustainable development strategy.

MMK's Environmental Development Programme to 2025

by

29,9

thousand
tonnes

Reducing gross air emissions

by

10

times

Reducing emissions of extremely and highly hazardous substances

by

37,5

thousand
tonnes

Reducing pollutants discharged

11

thousand

Planting tree and shrub seedlings in Magnitogorsk

until 2025

at least

2,3

million
tonnes

Recycling of industrial waste every year

2

hectares

Reclaiming abandoned quarries every year

USD

74,6

M

Costs for environmental initiatives in 2020

every year

Achievement of MMK’s 2020 environmental targets

In 2020, MMK achieved the majority of its environmental targets

Investment in environmental initiatives until 2025

Total amount: RUB 38.1 billion

Preventing water pollution
Waste recycling, reclamation
Preventing air pollution

Achievements 2000 - 2021

  • Construction of electric arc furnaces and the transition to continuous casting of steel, which enabled MMK to decommission all open-hearth furnaces
  • Construction of dust exhausting systems for cast houses and blast furnace stock houses with an overall capacity of 7.2 mcm/hour

BY

24,5

thousand
tonnes

Reducing gross air emissions

by

10

times

reducing emissions of extremely and highly hazardous substances

BY

37,5

thousand
tonnes

reducing pollutants discharged

Air pollutant emission dynamics

Gross emissions , thousand tonnes
Specific emissions , kg / tonne of steel
  • Construction of new and redesign of existing local circulation water supply systems
  • Redesign of the mining facilities’ wastewater system
  • Elimination of the impact of water treatment facilities’ repairs on the circulation water supply system

by

2,9

times

emissions reduced

Dynamics of reduction of discharges into water bodies

Gross air emissions, thousand tonnes
Specific emissions, kg / tonne of steel
  • Reusing 100% of iron-containing waste
  • Construction of a plant for draining sludge deposits formed during the treatment of converter gases
  • Construction of a plant to enrich iron-containing sludge deposits from storage facility No. 2 with an annual processing capacity of up to 2 million tonnes of industrial waste
  • Utilising 100% of the annually generated slag
  • Reclamation of retired iron ore pits and waste storage facilities

by

4,9

times

the volume of slag dumps decreased until 2025

Dynamics of emissions of pollutants into the atmosphere

2000
92.9
Slag accumulated in dumps
2018
41.2
Slag left in dumps
2025
19
Slag will be in dumps by 2025
  • Over six years, the Company plans to allocate RUB 57 million to plant 11,000 tree and shrub seedlings in Magnitogorsk
  • As part of our greening programme, we focus on both the Company's facilities and adjacent land plots as well as the city’s residential areas and territories of social institutions, parks and public gardens

Dynamics of emissions of pollutants into the atmosphere

2017
1460
Ash and maple, Siberian spruces
2018
3250
Cotoneaster
2025
2300
Norway maple, linden, birch and mountain ash
Key environmental projects

MMK adopted the 2020 Environmental Programme that included 105 initiatives, of which 98 were implemented in the reporting period and 7 projects are in progress in 2021.

In 2020, expenses on the initiatives totalled $74.6 million, including $55.9 million for capital construction.

The Group's overall environmental expenses amounted to $109.3 million, or 1.5% of its revenue. The share of environmental expenses in the Group’s revenue remained flat vs 2019.

52

projects

to reduce pollutant air emissions

20

initiatives

to reduce and prevent discharges of pollutants into water bodies

14

initiatives

for waste disposal and environmentally safe waste storage, as well as land reclamation

19

initiatives

environmental initiatives to be implemented by subsidiaries

Key environmental projects

Sinter Plant No. 5: decommissioning of sinter plant No. 4 (October 2019)

Sinter Plant No. 5: decommissioning of sinter plant No. 4 (October 2019)

Sinter Batch Preparation Shop

Sinter Batch Preparation Shop

Greening in Magnitogorsk and at MMK

Greening in Magnitogorsk and at MMK

Blast Furnace No. 2 (dust exhausting systems at the cast houses)

Blast Furnace No. 2 (dust exhausting systems at the cast houses)